The City of South Gate is collaborating with Caltrans
on the design and construction of the new I-710 Southbound on-ramp located on
Firestone Boulevard. Currently, the project undergoing review and the design is
estimated to be completed Summer 2019. The new design will realign the on-ramp
and provide a dedicated lane to allow traffic to flow in a safer, more
convenient way. The southerly side of the Firestone Bridge is currently closed
to foot traffic, therefore pedestrians and bicyclists are strongly encouraged
to use the northerly side of the Firestone Bridge to cross, if needed.
Project Contact: Elias Saikaly, Project Manager, 323-563-9581