Well No. 19 Pump Replacement

The project consists of furnishing and installation of pump, electric motor, column pipes, level sensor, airline, and electrical wiring at City of South Gate Well No. 19. The well pump, discharge head, and column pipes that were installed at this location have already been removed by the City. Also includes, sand blasting and epoxy coating of existing discharge head prior to installation, well disinfection, airline and pressure gauge, replacing pre-lube valves, camera port, and at the project site.

Related documents:

http://www.ebidboard.com/public/projects/index.asp?mbrguid={BF2C74EF-A2E4-4DE1-838F-6B35DAA0E099}